First-Piece Inspection: Why It Is Mandatory After Tool or Material Change
What It Is
At shift start, tool change, material change or program change, the first piece is fully inspected before batch production.
When Required
- Shift start
- Insert/tool change
- New material batch
- Program/parameter change
- After machine repair
Checks
- Visual: Burrs, scratches, chatter, chipped edges
- Critical sizes: Fits, lengths
- GD&T: Roundness, concentricity, perpendicularity
- Roughness: Out-of-spec means parameter/tool issue
Records
- Log: time, machine, part, operator, values
- Keep first-piece sample
- Stop and isolate on any out-of-spec
Huami System
Huami runs first-piece, patrol and final inspection with traceable records.